The Saprissa bridge (bridge over the Virilla river on national route 32) has been inaugurated by Rodolfo Méndez, minister of the Ministry of Public Works and Transport (MOPT) of Costa Rica, who highlighted in the opening that the work was executed in compliance the established deadlines and costs. The project, executed in 18 months, has a total length of 856 meters, which includes the bridge with a length of 286 m, with a deck executed by successive cantilevers whose width is 14.3 m and is supported by 2 piers 50 m high.