Road infrastructure with a 162 m long collaborative deck, on a reinforced concrete arch with 100 m span and 50 m high, built in situ on falsework to the ground, compressed by opening the key. Piers attached to support the deck, made up of prefabricated box girders, and a slab executed with traveller. It was executed in 11 months.