Infrastructure for a 1,657 m long road with a cable-stayed section of 100 m span over the navigation channel. Variable width up to 16.5 m, deck executed by asymmetric hyperstatic beams attached in cable-stayed section. It was executed in 24 months. It obtains in the San Telmo 2015 Prize, the second prize for the best civil engineering work.