Construction of three overpasses on the Interamerican Highway North, passing through Cañas, Liberia and Bagaces with a maximum length of 412m. They are made up of 21m wide post-tensioned bent-vertebrated in-situ concreted decks, executed with portal formwork. Execution period 20 months.