Rail infrastructure for high speed 900 m in length. Box beam deck with a maximum span of 80 m. Executed in several phases of concreting and stressing in order to optimize the acting loads. It ran in 10 months. Record in Spain for maximum AVE deck light executed with movable scaffolding system.