Airport work consisting of a loan embankment of 3 million m3, to increase the dimensions of the runway up to 2,500 m in length, allowing the Airbus A320 to operate at full load. Execution period of 32 months.
Airport work consisting of a loan embankment of 3 million m3, to increase the dimensions of the runway up to 2,500 m in length, allowing the Airbus A320 to operate at full load. Execution period of 32 months.