Construction auxiliary means for the execution of in-situ concrete slabs, it can work on mixed or concrete decks. It is an equipment with great capacity to adapt to the geometry of the bridge deck, and does not require machinery support from the ground, so it is independent of the height at which it works. The conventional work output is 48m of deck length per week.