Connection of the A-7 Mediterranean motorway, with the A-381 Ruta del Toro motorway. Project of great constructive difficulty given the geotechnical area of marshes through which it runs. The duration of the works was 19 months.
Connection of the A-7 Mediterranean motorway, with the A-381 Ruta del Toro motorway. Project of great constructive difficulty given the geotechnical area of marshes through which it runs. The duration of the works was 19 months.