Railway infrastructures part of the Montero-Bulo Bulo section, with a maximum length of 799m, width of 7.3m and depth of 2.6m, with a maximum span of 39m thanks to the use of a pre-stressed system in the edges of the formwork, avoiding the need for intermediate supports.